The town of Camden will perform repairs to Seabright Dam Thursday, June 20. This project will require the level of water to be lowered in the river upstream of the dam by approximately 18 inches. The current plan is to start lowering the river level early in the morning; repairs are expected to be complete by afternoon and the river back up to its usual level by Friday morning.

Those with questions pertaining to the project should call 236-7955.